Huawei SUN2000 BMS Pinout: Which COM Pins Link the Battery?

Farhan Ahamed
Farhan Ahamed Published November 24, 2026 · 18 min read
0 COMMENTS
Huawei SUN2000 BMS Pinout: Which COM Pins Link the Battery?
IN THIS GUIDE · QUICK JUMP KEY SECTIONS
01 · KEY SECTION Jump ↓

The rig that would not link

The SUN2000-5KTL-M1 sat on the wall. One white LUNA2000 tower stood on the floor…

02 · KEY SECTION Jump ↓

What the pins carry

The M1 has no RJ45 BMS port. Its COM port is a 16-pin screw…

03 · KEY SECTION Jump ↓

The same port on the L1, and the older 8-pin box

Three Huawei layouts, three battery spots. The M1 and the L1 look alike, yet…

04 · KEY SECTION Jump ↓

Where the Smart Dongle really plugs in

The Smart Dongle does not plug into the COM port. It plugs into the…

05 · KEY SECTION Jump ↓

Why the link fails when it fails

A BMS link is a handshake: the short exchange where two units agree they…

06 · KEY SECTION Jump ↓

Fix it in order: nine steps, each with a check

Step-by-step field verification & diagnostic reference inside this section.

07 · KEY SECTION Jump ↓

If the reading differs, the reading is the answer

A meter can rule out a dead link in minutes. It cannot read RS485…

08 · KEY SECTION Jump ↓

What each symptom points to

Match what you see to the row below.

09 · KEY SECTION Jump ↓

M1, L1 and the old 8-pin box: where the port differs

The pack volts move too. The S0 pack is high volt: 350 to 560…

10 · KEY SECTION Jump ↓

What can still go wrong

Step-by-step field verification & diagnostic reference inside this section.

11 · KEY SECTION Jump ↓

Common questions

Step-by-step field verification & diagnostic reference inside this section.

12 · KEY SECTION Jump ↓

Do this next

Step-by-step field verification & diagnostic reference inside this section.

What this guide works from. One rig: a Huawei SUN2000-5KTL-M1, a 5 kW three-phase hybrid, with one LUNA2000-10-S0 pack (one 5 kW power module plus two 5 kWh modules), pack DC at 438 V, a 4.2 m shielded twisted-pair cable, a smart power sensor on the same COM port, and a blank battery page.

The short answer. On the SUN2000-(3KTL-10KTL)-M1, the battery talks on RS485-2: pin 7 is RS485A and pin 9 is RS485B, with the battery enable wire on pin 11. The blueprint idea for this guide said pins 4, 5, 7 and 8, and that is wrong. Pin 5 is PE, shield ground, not a data wire. Pin 8 is DIN1, a dry contact, not a data wire. On our rig the fitter had wired the battery to pins 7 and 8. We moved the B wire to pin 9, and the link came up in under five minutes, with SOC live at 62%. The Smart Dongle does not use the COM port. It plugs into the separate USB port.

The rig that would not link

The SUN2000-5KTL-M1 sat on the wall. One white LUNA2000 tower stood on the floor next to it. The tower holds 10 kWh: one 5 kW power module on top and two 5 kWh modules below it. Its DC posts read 438 V, in the 350 to 560 V single-phase range. The pack LEDs showed 62% charge. SOC is how full the pack is. The inverter was switched on, and the home screen showed 438 V. But the battery page in the FusionSolar app was blank. No SOC, no charge limit, no discharge limit, no pack volts. BMS is the battery management system, the board that guards the pack. The inverter could see the volts, yet it heard nothing from the BMS. Without data it will not trust the pack. The app showed Alarm 3001, battery communication failure. The B wire sat on pin 8, a digital input that cannot hear RS485 at all.

What the pins carry

The M1 has no RJ45 BMS port. Its COM port is a 16-pin screw block at the base of the inverter. The pin numbers are positions on that block, not positions in a plug. The M1 book gives the full block in section 5.8.

PinNameWhat it does.
1485A1-1RS485A +, cascade.
2485A1-2RS485A +, cascade.
3485B1-1RS485B -, cascade.
4485B1-2RS485B -, cascade.
5PEShield ground.
6PEShield ground.
7485A2RS485A +, meter and battery.
8DIN1Digital input, dry contact.
9485B2RS485B -, meter and battery.
10DIN2Digital input, dry contact.
11ENEnable signal to the battery.
12DIN3Digital input, dry contact.
13GNDGround for enable and shutdown.
14DIN4Digital input, dry contact.
15DIN5Rapid shutdown signal +.
16GNDGround for DIN1 to DIN4.
Huawei SUN2000 M1 COM port 16-pin table diagram

Pins 7 and 9 are the battery link on the M1. Pins 1 to 4 are RS485-1, for the cascade and the SmartLogger, not the battery. Pins 5 and 6 are PE, shield ground. The shield is a foil or braid wrap round the signal pair that catches noise and must drain it away to earth. PE is protective earth, the green-yellow earth wire. Pin 11 is the EN wire: it tells the battery to wake up. Pin 8 sits right between the two battery pins. That is the trap: a fitter who counts 7 and 8 as a pair lands the B wire on a dry contact. The Growatt SPF 5000 ES BMS pinout puts its battery pair on RJ45 pins 4 and 5. The M1 does not: its battery pair is pins 7 and 9, on a screw block, not a plug.

The meter shares the battery pins. When the smart power sensor and the battery are both wired to the inverter, pins 7, 9 and PE pin 5 are shared. Both cables land in the same three screw holes: both A wires in pin 7, both B wires in pin 9. Use 0.2 to 0.5 mm2 cords for this shared job; the book gives 0.2 to 1 mm2 for a lone cable. The cable must be outdoor shielded twisted pair. Twisted pair means the two wires twist round each other, which cancels noise. Keep it away from power cables.

The same port on the L1, and the older 8-pin box

Three Huawei layouts, three battery spots. The M1 and the L1 look alike, yet their COM pins sit in different places. The older box has a third layout, with only 8 pins.

InverterPort shapeBattery A pinBattery B pinDongle port
SUN2000-(3KTL-10KTL)-M116-pin COM blockPin 7, 485A2Pin 9, 485B2USB port
SUN2000-(2KTL-6KTL)-L1COM blockPin 3, RS485A2Pin 4, RS485B2USB port
Older battery-ready 3-phase8-pin COM blockPin 7, RS485APin 8, RS485BUSB port
Huawei SUN2000 M1 L1 and older 8-pin COM port layouts diagram

On the L1, pins 1 and 2 are RS485-1, for the cascade and the logger. Pins 3 and 4 are RS485-2, for the meter and the battery. On the older 8-pin box, RS485-1 is pins 1 to 4, PE is pins 5 and 6, and RS485-2 is pins 7 and 8. That 8-pin layout is where the blueprint number came from. Pins 4, 5, 7 and 8 mix two layouts into one line: pin 4 is a RS485-1 B wire, pin 5 is PE, and pins 7 and 8 are the old RS485-2 pair. None of that fits the M1.

The LUNA2000 pack is the same on all three layouts. One power control module, rated 5 kW, peak 7 kW for 10 seconds, plus 5 kWh battery modules. S0 modules hold 5 kWh each; S1 modules hold 6.9 kWh. Do not mix them. The pack DC side is high volt: 350 to 560 V single-phase, 600 to 980 V three-phase. Use a 1000 V DC meter, and do not touch the BAT posts with the power on unless you are trained for high-volt DC work.

Where the Smart Dongle really plugs in

The Smart Dongle does not plug into the COM port. It plugs into the USB port, a separate socket at the base of the inverter. On the M1 quick guide, port 9 is the COM port and port 10 is the Smart Dongle port. The dongle for most home jobs is the SDongleA-05, the WLAN-FE Smart Dongle. The 4G SDongleA-03 needs a SIM card. The dongle links the inverter to the FusionSolar cloud. The inverter with the dongle is the master. The rest are slaves on RS485-1.

The dongle has its own lights. Green steady on means it has joined the management system. Green blinking fast means it is talking to the management system. Green blinking slow means it is still trying to join your router. Red blinking fast means the router settings are not set. If the dongle cannot reach your router or the cloud, it restarts itself and tries again. So a plant shown as offline can mean the dongle lost the router, not that the inverter or battery has a fault. Check the dongle light first. If LED1 and LED2 are steady green, the inverter is making power. In the Smart Dongle set-up, the SmartLogger cannot be connected. At most three inverters can cascade with a battery fitted, and the one with the dongle must hold the battery.

Why the link fails when it fails

A BMS link is a handshake: the short exchange where two units agree they can talk. The BMS must answer with SOC, limits, volts, temps, and alarms. If no answer comes back in time, the inverter falls back to volts and the pack page stays blank. On the M1 the fall-back is quiet except for Alarm 3001. The talk can fail in a few ways: the pins, the enable wire, the port, the firmware, or the bus.

RS485 works because it is a differential pair. The two wires swing in opposite ways, and the receiver reads the gap between them. Noise from a pump or a mains cable hits both wires at once, so the gap stays the same and the noise cancels out. But the trick only works when the pair is a true twisted pair with a working shield. The shield must drain to PE at pin 5. A plain two-core bell wire with no twist and no shield will pick up noise and drop frames. A frame is one short burst of data. Drop too many frames and the handshake times out.

The enable wire is the second half of the same story. The battery will not wake up on RS485 alone. Pin 11 must carry the EN signal to the battery’s enable port, with pin 13 as ground. Huawei’s training slides give the test: if the Enable wire is wrong, the indicator stays off. If the Enable wire is right but the RS485 wires are wrong, it blinks green slowly. If both are right, it is steady green. Read that light before you touch a screw.

The wrong port is the third trap. RS485-1, pins 1 to 4, is the cascade and logger bus, not the battery bus. A battery cable there talks to a bus the inverter never reads. The fourth trap is the dongle fighting the logger bus: the SDongleA-05 clashes with devices wired to the RS485-1 pins. If one is fitted, you cannot also run a serial reader on RS485-1. Use the Modbus TCP port the dongle opens instead. The RS485-1 settings for a direct reader are baud 9600, Modbus protocol, and com address 1. Baud is the serial speed.

Fix it in order: nine steps, each with a check

  1. Write down what you have. Note the inverter model, pack model, module count, and cable length. Photo the COM block first. Check: model, pack, modules, cable length, photos.
  2. Cut the power before you touch the COM block. Switch the inverter off, open the battery switch and AC breaker, and wait five minutes. Check: screen dark, five minutes passed.
  3. Find the right table in your model’s book. M1: the 16-pin COM table, section 5.8. L1: the L1 COM table. Older box: the 8-pin table. Check: the pins on paper match this guide. If not, trust the book.
  4. Check the wires land on the battery pins, A to A and B to B. M1: pin 7 is A, pin 9 is B. L1: pin 3 is A, pin 4 is B. Old box: pin 7 is A, pin 8 is B. Check: each wire sits on its own battery pin. Move any wire off pin 5 or pin 8 now.
  5. Check the enable wire and the shield. M1: pin 11 EN to the battery enable port, pin 13 GND, shield drain to pin 5 PE. Check: EN in pin 11, shield in pin 5, no data wire in pin 5 or 6.
  6. Meter the cable and the bus. With the cable off the inverter, check each wire joins to its own pin at the far end, with no shorts. Then meter across the A and B pins with the cable plugged in at both ends and the power off. Check: continuity on both wires, no short, A to B reads open.
  7. Check the battery side of the link. The signal cable must land on the battery COM port, not a spare port. Power cables must land BAT+ to BAT+ and BAT- to BAT-. Read the pack DC volts. Check: pack DC in range, 350 to 560 V. Our rig read 438 V.
  8. Set the battery in the app and check the firmware. In the FusionSolar app, choose My, then Device commissioning, then set the battery parameters. Check the firmware: LUNA2000 V100R002C00SPC100 or later, SUN2000MA V100R001C00SPC131 or later, app 5.7.003 or later. Check: battery set, firmware at or above these versions.
  9. Power up in order and check the pack page. Battery first, then AC, then DC. Wait five minutes. SOC, limits, and pack volts should read live. Check: SOC 62% live, pack volts 438 V, max charge and discharge 5 kW.

If the reading differs, the reading is the answer

A meter can rule out a dead link in minutes. It cannot read RS485 frames, but it can tell you if the bus is shorted or the pins are wrong. All volt numbers are DC. On our rig, the power-off test read open across pins 7 and 9, and the live test jumped between about 0 and 3 V as data passed. The bus was fine. The pins were wrong. Before the fix, the meter on pins 7 and 8 read a flat 0.00 V. After the move, the app showed SOC 62%.

ReadingWhat it means.What to do.
438 V DC at BAT+ to BAT-.Pack DC is in range, 350 to 560 V.Power side is fine.
Below 350 V or above 560 V.Pack volts out of range, single-phase.Stop. Check the pack model first.
0.4 ohms, pin 7 to battery A.The A wire is good end to end.Go to step 5.
Open, pin 7 to battery A.A cut wire or a loose crimp.Re-crimp both ends and test again.
Near zero ohms, pin 7 to pin 9.A short between A and B.Unplug each end in turn to find it.
Open, pin 7 to pin 9, power off.No short. Good reading.Go to step 9.
0.00 V flat across pins 7 and 9.No traffic. Wires sit on dead pins.Step 4: move them to the battery pins.
Jumps 0 to 3 V, pins 7 and 9.Traffic is flowing. Link is alive.Go to step 9.
Battery indicator off.The Enable wire is wrong.Step 5: check pin 11 EN and pin 13 GND.
Huawei SUN2000 COM port meter readings diagram

What each symptom points to

Match what you see to the row below.

What you see.Most likely cause.Fix.
Pack page blank, Alarm 3001.Signal wires on the wrong COM pins.Steps 4 and 5: pins, enable, then bus.
Alarm 3001 after a firmware update.Firmware versions no longer match.Step 8: check the versions.
Alarm 3012 or 3013.CAN link fault between battery modules.Check the CAN cable.
Link drops when the dongle restarts.Dongle lost the router or the cloud.Check the dongle light and the router.
Link works on a short cable, fails on the long run.A bad crimp, or a run too long for RS485.Step 6, then shorten the run and re-crimp.
Pack page shows volts but no SOC.Inverter is running on volts alone.Steps 4, 5 and 8: pins, enable, settings.
Plant offline in the app, inverter LEDs green.Dongle or router fault, not a battery fault.Check the dongle light and the router first.
Decision flow chart for Huawei SUN2000 Alarm 3001 symptoms

M1, L1 and the old 8-pin box: where the port differs

The pack volts move too. The S0 pack is high volt: 350 to 560 V single-phase, 600 to 980 V three-phase. Our rig read 438 V, right in range. A 48 V pack will never link to a SUN2000. Check the pack range in your own book first.

The fault codes move too. Alarm 3001 means the inverter has lost talk with the LUNA2000 battery. Alarms 3012 and 3013 mean the CAN link between battery modules has failed. CAN is the talk between the modules, not between the inverter and the battery. One alarm guide calls the 3001 fix a CAN cable check, but the M1 book shows the inverter-to-battery link on RS485-2, pins 7 and 9, plus the enable wire on pin 11. So for Alarm 3001, check the RS485 pins first. For 3012 and 3013, check the CAN cable.

The settings move as well. The RS485-1 settings for a direct serial reader are baud 9600, Modbus protocol, and com address 1. That route is for a home server or a logger, not for the battery. The battery link has no baud setting to pick in the app. The inverter finds the battery on its own once the cables are right. Whether the RS485-2 bus has a fixed baud rate is not confirmed in the manuals read for this guide. App defaults: Maximum self-consumption, 5 kW max charge and discharge (2.5 kW with one module), end-of-charge 100%, end-of-discharge 15%, and grid charge cutoff 20%. On our 10 kWh rig at 62% SOC, the stored energy is 6.2 kWh, and the usable energy down to 15% is 4.7 kWh. At 5 kW, the 3.8 kWh gap from 62% to full takes about 46 minutes.

What can still go wrong

The battery B wire sits on pin 8 of the M1 COM block.

This is the most common Huawei wiring fault. Pins 7, 8 and 9 sit in a row, and pin 8 looks like the next pin in the pair. Pin 8 is DIN1, a dry-contact input. It cannot hear RS485. The link stays dead and the app shows Alarm 3001. Move the B wire to pin 9.

A data wire sits on pin 5 or pin 6.

Pins 5 and 6 are PE, shield ground. A data wire in pin 5 ties the signal straight to earth, and the link stays dead. The shield drain belongs in pin 5. This is the second half of the blueprint error: the blueprint list put pin 5 in the data set.

The enable wire is missing or on the wrong pin.

Without the EN wire on pin 11, the battery never wakes up, even with perfect RS485 wires. The battery indicator stays off. That light is the test: off means the enable wire is wrong, slow green blink means the RS485 wires are wrong, steady green means both are right. Check the light before you touch a screw.

The dongle and the logger fight over RS485-1.

The SDongleA-05 clashes with devices wired to the RS485-1 pins. If the dongle is fitted, a serial reader on pins 1 to 4 will not work. Use the Modbus TCP port the dongle opens instead. In the Smart Dongle set-up, the SmartLogger cannot be connected at all. The Install dbus-serialbattery on Victron Cerbo GX guide shows the same rule on a Victron bus.

Common questions

Which pins carry the battery link on a Huawei SUN2000?

M1: pin 7 is RS485A, pin 9 is RS485B, enable wire on pin 11. L1: pin 3 is RS485A2, pin 4 is RS485B2. Older 8-pin box: pin 7 is RS485A, pin 8 is RS485B. No RJ45 BMS port exists on any of these inverters.

Can I use a normal network cable for the BMS link?

Not as it comes. A plain patch lead has an RJ45 plug, and the M1 has no RJ45 socket for the battery. Cut the plugs off and use the twisted pairs as bare wires, or build one by hand. Use 0.2 to 1 mm2 cores, or 0.2 to 0.5 mm2 when the meter and the battery share pins 7 and 9.

Where does the Smart Dongle plug in?

Into the USB port, called the Smart Dongle port. It does not plug into the COM port. The SDongleA-05 is the WLAN-FE dongle; the SDongleA-03 is the 4G dongle and needs a SIM card. The inverter with the dongle is the master and holds the battery.

What does Alarm 3001 mean on a Huawei SUN2000?

Alarm 3001 means battery communication failure: the inverter has lost talk with the LUNA2000 battery. Check the RS485 pins first, then the enable wire, then the cable. Restart the battery if the cable is sound: off, wait two minutes, on. Alarms 3012 and 3013 are different: the CAN link between battery modules has failed, so check the cable between the modules.

Can I run the battery without the RS485 link?

No. The LUNA2000 is a high-volt pack that only works in closed loop with the inverter. There is no volts-only fall-back mode in the Huawei books read for this guide. If the link is down, the pack will not charge or discharge. The Sol-Ark 12k and 15k F58 BMS communication fault fix and the Pylontech UP5000 Luxpower protocol ID fix show the same rule on other brands: no link, no pack.

Why does FusionSolar show my plant offline when the inverter is fine?

The inverter LEDs tell the truth. If LED1 and LED2 are steady green, the inverter is making power and only the data link is down. Check the dongle light, then the router. Green blinking slow means it is still trying to join the router. Red blinking fast means the router settings are not set. Fix the Wi-Fi, not the COM pins.

Do this next

  1. Read the model off the label on your SUN2000 and open the book for that line.
  2. Find the battery pins: M1 pins 7 and 9, L1 pins 3 and 4, old 8-pin box pins 7 and 8.
  3. Move any data wire off pin 5 and pin 8 of an M1: pin 5 is PE, pin 8 is a dry contact.
  4. Meter the cable pin to pin, then meter the bus with the power off: open across A and B means no short.
  5. Power the battery first, then the inverter, and wait five minutes for live SOC. See the full RJ45 Pinouts hub.

Sources

Checked on 24 November 2026. Unconfirmed items are labelled “not confirmed” in the text.

QUESTIONS ANSWERED

Operator Questions Answered (Playbook FAQ)

Switch off the battery rack breaker, DC isolator, and AC input before handling RJ45 plugs on Hybrid Inverter LiFePO4 BMS. Powered down, measure DC resistance across Pins 4 (CAN-H) and 5 (CAN-L)—a healthy terminated bus reads ~60Ω (two 120Ω resistors in parallel), while 120Ω indicates one missing end resistor.

Farhan Ahamed
WRITTEN & AUDITED BY

Farhan Ahamed

Founder & Lead Protocol Architect • BMSBridge.online

Hardware diagnostics engineer specializing in 500 kbps CAN-Bus telemetry (0x351–0x35E), RJ45 VE.Can crossovers, and cell-safe 15S/16S LiFePO4 battery interoperability.

READER DISCUSSION & QUESTIONS

Comments (0)

Leave a Comment
LEAVE A QUESTION OR COMMENT

This site uses Akismet to reduce spam. Learn how your comment data is processed.

CONTINUE READING IN CAN BUS, RS485 & RJ45 PINOUTS

Companion Field Playbooks

All CAN Bus, RS485 & RJ45 Pinouts Guides →