What this guide works from. One rig: a Sunsynk SYNK-5K-SG04LP1, a JK Inverter BMS (PB series, JK-PB2A16S20P) on a 16-cell LiFePO4 pack, 280 Ah, resting at 52.8 V, JK app showing 58% charge, F58 on the screen.
The short answer. Yes, it can. Set the Sunsynk to Battery Type Lithium and Lithium Mode 00, the Pylontech CAN code. Set the JK Inverter BMS to its Pylontech CAN profile, PYLON CAN V1.2, at 500 kbps. Wire CAN-H to CAN-H and CAN-L to CAN-L on pins 4 and 5 of the inverter BMS port. On our rig F58 cleared within two minutes of the fix. The fault was a full 8-wire Ethernet lead. It joined the RS485 pins with the CAN pins. We built a two-wire lead for pins 4 and 5 only. Then the Li-BMS page filled in.
The rig that would not link
It was a new build, and it looked right. The Sunsynk SYNK-5K-SG04LP1 sat on the wall. The battery box held 16 LiFePO4 cells. A JK Inverter BMS sat on top of the pack. The pack read 52.8 V. That is 3.30 V per cell, times 16 cells. The JK app showed all 16 cells between 3.29 V and 3.31 V, and 58% charge. Then the inverter was switched on. F58 showed on the screen. F58 is the BMS comms fault. It means the inverter looked for BMS frames and did not get them. A frame is one short packet of data. The home screen showed a voltage. The Li-BMS page stayed blank. The inverter ran on voltage alone. The cable looked fine. It was a new Ethernet lead. But it was the wrong cable for this job.
What the pins carry
Sunsynk and Deye inverters come off the same line. Almost all of the JK BMS to Deye setup guide still holds here. Watch the Sunsynk menu and fault names on screen. This guide covers the Sunsynk Ecco single-phase range, SYNK-3.6K-SG04LP1 and SYNK-5K-SG04LP1, plus the 3K and 6K models in the same SG04LP1 family. The larger 8K and 12K models share the same BMS port and Mode 00. Check your manual’s function-port table first. On the inverter-side BMS port, pin 4 is CAN-H and pin 5 is CAN-L. Pins 1, 2, 3, 6, 7 and 8 are not linked for CAN. The same manual also prints a battery-side table, with CAN-H on pin 1 and CAN-L on pin 5. That is the battery end, not the inverter end. Mix the two tables up and the link will not work. The full pin-by-pin drawing is in the Deye & Sunsynk BMS port pinout guide.
| Pin | Sunsynk BMS port | JK PB CAN port |
|---|---|---|
| 1 | RS485, not CAN | RS485B |
| 2 | RS485, not CAN | RS485A |
| 3 | RS485, not CAN | Not used |
| 4 | CAN-H | CAN-H |
| 5 | CAN-L | CAN-L |
| 6 | Not used | Not used |
| 7 | Not used | Not used |
| 8 | Not used | Not used |
On the JK PB interface board, use the socket marked CAN. Do not use RS485-1 or the parallel link socket. The common PB layout lists CAN-H on pin 4 and CAN-L on pin 5. Some board drawings show them swapped. JK’s own papers disagree on which pin is CAN-H and which is CAN-L on some boards. This is not confirmed as a misprint in either sheet. Read the print on your own board and wire H to H and L to L. Build the cable by hand. Use short shielded twisted-pair cable, Cat5e or Cat6. Put CAN-H and CAN-L on the same twisted pair, the blue pair in T-568B, pins 4 and 5. Wire only pins 4 and 5. Field reports point to one fix: leave pins 1, 2 and 3 out. A full 8-wire cable joins the RS485 pins with the CAN pins, and the bus never settles. Test the cable, then power the BMS first, then the inverter. The Sunsynk has a BMS 485/CAN port and a split RS485 port. The RS485 port does not carry the battery link. The same goes for a plain RJ45 splitter sharing the 2-in-1 BMS port between the battery on CAN pins 4 and 5 and a monitor on RS485 pins 1 to 3.

Which setting fits your battery
On the Sunsynk touch screen, go to Battery Setting. Set Battery Type to Lithium. Set Lithium Mode to 00. In the same menus, set the battery size and the charge and discharge amps to match your pack, and tick BMS_Err-Stop. Sunsynk’s lithium guide shows Shut Down at 3% and Low Batt at 5% as a worked case. Set the real numbers from your own battery’s limits. The Sunsynk SG04LP1 manual puts the code under Battery Setting, in a field marked Lithium Mode. For Pylontech on CAN, that code is 00. For Pylontech on RS485, it is 12 in field reports. Pick CAN first. It runs at 500 kbps. People set the inverter to Lithium Mode 00, then pick a Pylontech RS485 profile in the JK app, or the other way round. Nothing talks. Match the bus on both ends. Pylontech CAN runs at 500 kbps. The JK manual lists a stock CAN rate of 250 kbps. Set the JK app to 500 kbps if it shows a baud setting. JK does not show up as a named battery on Sunsynk’s own list. That list names Pylontech US2000B, US3000, US2000C, US3000C, UP5000, US5000, Force L1 and Force L2 on CAN with Mode 00. It also names Dyness, BYD and Weco. Running a JK BMS on the Pylontech CAN profile is a match in how they talk, not a Sunsynk-approved pair. Test it on your exact model and firmware first.
| Setup | Bus and speed | Sunsynk setting | JK side |
|---|---|---|---|
| CAN Pylontech | CAN, 500 kbps | Battery Type Lithium, Lithium Mode 00 | CAN protocol: Pylontech / PYLON CAN V1.2 |
| RS485 Pylontech | RS485, Pylontech rate | Battery Type Lithium, RS485 code 12 (field reports) | RS485-1 protocol: Pylontech RS485 |
| Open-loop, no comms | No data cable | Battery Type Use Batt V | BMS protects the pack, inverter follows voltage only |
Set the DIP switches on the JK PB board before you power the BMS for the last test. For one pack, use DIP 1000: switch 1 ON, switches 2, 3, and 4 OFF. That sets the pack as address 0, the master. In a bank in parallel, only one pack is the master. The rest need their own addresses and link cables between RS485-2 ports. Do not set two packs to 1000. One flag: JK’s own manual lists address 0 as all four switches OFF, not 1000. The 1000 setting comes from field reports for the Deye and Sunsynk pair. If your board prints its own address table, follow that. The master must be address 0, with no two packs sharing an address. Only the JK Inverter BMS, the PB series, has a CAN port made to talk to an inverter. The older JK-B series will not do this on its own. Those are the small Bluetooth-only smart BMS boards. They do not speak Pylontech CAN to an inverter. They need a bridge: an ESP32 board that runs YamBMS or esphome-jk-bms-can. Most DIY packs here are 16S LiFePO4, 51.2 V nominal, while Pylontech’s own packs are 15S, 48 V nominal. Fix the cell count first, or the charge target will be wrong.

Why the link fails when it fails
A CAN link is a handshake. A handshake is the short exchange where two units agree they can talk. The inverter sends a frame on the CAN bus. A frame is one short packet of data. The BMS must answer with its own frame: SOC, charge limit, cell volts, temps, alarms. If no answer comes back in time, the inverter raises F58 and stops trusting the pack. The talk failed. That talk can fail in only four ways: the wire is wrong, the port is wrong, the protocol is wrong, or the bus is broken. A reboot fixes none of these. It changes nothing about the wire, the protocol, or a DIP switch set for the wrong address. One rare case: the BMS was asleep and woke up during the power cycle. That is luck, not a fix. The Sunsynk trap is the 8-wire lead. An Ethernet patch cable joins all eight pins. Pins 1 to 3 carry RS485. Pins 4 and 5 carry CAN. Join them all and the bus never settles. The meter test can still pass pin to pin. The cable is not broken. It is just built for a network switch, not for a BMS. That is why this guide wires only pins 4 and 5 and cuts back the rest.
Fix it in order: nine steps, each with a check
Work the steps in order. If a check fails, stop there.
- Write down what you have. Do this step, then check it. Check: model names, firmware, and photos in hand .
- Cut the power before you touch a plug. Do this step, then check it. Check: LCD dark, battery breaker off .
- Build the cable by hand for pins 4 and 5 only. Do this step, then check it. Check: CAN-H to CAN-H, CAN-L to CAN-L, pins 1 to 3 left out .
- Plug into the right sockets. Do this step, then check it. Check: Sunsynk BMS 485/CAN port, JK CAN socket, not the meter port .
- Set DIP 1000 on a single pack. Do this step, then check it. Check: switch 1 ON, switches 2, 3, and 4 OFF, address 0, master .
- Set the JK app to Pylontech CAN at 500 kbps. Do this step, then check it. Check: CAN protocol reads PYLON CAN V1.2, rate reads 500 kbps .
- Set the Sunsynk to Lithium, Mode 00, BMS_Err-Stop ticked. Do this step, then check it. Check: menu reads Lithium, Mode 00, BMS_Err-Stop on .
- Check the bus with a meter, power off. Do this step, then check it. Check: about 60 ohms between CAN-H and CAN-L .
- Power up in order and wait five minutes. Do this step, then check it. Check: Li-BMS page shows live voltage, current, heat, and SOC that match the JK app .

If the reading differs, the reading is the answer
A meter can rule out a dead link in minutes. It cannot read CAN frames. But it can tell you if the bus is shorted or open. All volt numbers are DC to ground, on a high-speed CAN bus built to ISO 11898-2. On a live bus with traffic, a plain meter shows the average: CAN-H reads 2.6 to 3.0 V and CAN-L reads 2.0 to 2.4 V. Only an oscilloscope shows the true peaks: CAN-H toward 3.5 V, CAN-L toward 1.5 V. You do not need one here. On our rig, the power-off test read 60 ohms after the new cable, and the idle test read 2.5 V on each line. Before the new cable, the same test read 118 ohms: the 8-wire lead had joined pins that should stay apart. Do the 60 ohm check now if you never did it, powered off, between CAN-H and CAN-L. A lost terminator shows up as a link that comes and goes, not a dead one.
| Reading | What it means. | What to do. |
|---|---|---|
| About 60 ohms, power off. | Both 120 ohm end resistors are there. | Go to Step 9. |
| Near 120 ohms, power off. | One end resistor is missing. | Check the BMS end resistor. |
| Open circuit, power off. | No termination, a broken wire, or the plug is in a port with no CAN pair. | Check the port first, then test the cable. |
| Near zero ohms, power off. | A short between CAN-H and CAN-L. | Unplug each end in turn. If the short stays with the cable, replace the cable. |
| 2.5 V on each line, power on, idle. | Bus idle and healthy, but nobody is talking. | Check the protocol and the BMS power. |
| 2.6–3.0 V on CAN-H, 2.0–2.4 V on CAN-L. | Traffic is flowing. The link is alive. | Go to Step 9. |
| 0 V or pack volts on one line. | That line is shorted, or the signal chip is dead. | Stop. Unplug the BMS end. If the line clears, the fault is in the BMS. |

What each symptom points to
Match what you see to the row below. Then work the fix in that row. Do not change three things at once.
| What you see. | Most likely cause. | Fix. |
|---|---|---|
| F58 shows, Li-BMS page blank. | No BMS frames arrived. Cable, port, or protocol fault. | Steps 3, 4, 6, and 7 in order. |
| W31 shows before F58. | Flaky comms. Cable route or termination fault. | Check the cable route and the 60 ohm test first. |
| Link works, then drops at noon. | Cable run tight by DC lugs or AC wiring picks up noise. | Move it away from the power cables and shorten it. |
| Link reads fine, then the pack cuts out. | Cell fault, heat, or a protection trip in the BMS. | Open the JK app first. Look for a cell fault or a trip. |
| F56 shows. | DC bus bar voltage too low. Most often a flat battery. | Charge the pack. Check the BMS link too. |
| No Battery after a firmware update. | Lithium Mode codes moved or renamed. | Check the code list again before you touch the cable. |
F58, W31, and the BMS_Err-Stop trap
Sunsynk F58 is the BMS comms fault, listed as F58 BMS_Comm_Fault, or Battery_comm_Lose in older manuals. It means the inverter looked for BMS frames and did not get them. The manual’s fix is short: check the BMS cable link and the lithium battery settings. It also says you can turn off BMS_Err-Stop on the LCD. That is a trap. It hides the fault and lets the inverter run with no BMS data. Keep BMS_Err-Stop ticked once the link works. W31, Battery_Comm_Warn, often shows up before F58 and means flaky comms. Check the cable route and termination first. F56 is a new fault: DC bus bar voltage too low, most often a flat battery or a BMS that is not linked. Work the list in order. Test after each step. Check the cable is in the inverter BMS 485/CAN port and the JK CAN port, not RS485-2 or the meter port. Check Battery Type is Lithium and Lithium Mode is 00. Check the JK app code matches the bus you wired. Check the CAN rate is 500 kbps. Do the powered-off 60 ohm check between CAN-H and CAN-L. Check DIP is 1000 on a single pack. Power-cycle the BMS, then the inverter, and wait two minutes. Swap CAN-H and CAN-L at one end only if your board drawing shows the swapped pin order.
When open-loop is the right call
Closed-loop is best when it works. Open-loop is best when it is broken. Open-loop means no data cable. The inverter charges by voltage alone. Use it if the JK board has no CAN port, if the code will not link after a full check, or if you need the house running tonight. Switch the Sunsynk to Battery Type Use Batt V. Set the charge voltages from the battery sheet and the BMS limits. For a 16S pack use 55.2 V bulk, 53.6 V float, and 48.0 V cut-off. Voltage-based SOC on LiFePO4 is rough, since the discharge curve is flat in the mid part. Set a safe low cut-off. That fallback is covered in the Deye to Use Batt V guide and in Closed-Loop vs Open-Loop LiFePO4. See the open-loop voltage settings before you set the volts. To rescue a deep-discharge pack, switch to Use Batt V, charge it, then switch back to Lithium Mode 00. That is the deep-discharge rescue in short.
What can still go wrong
Two packs that do not match.
Do not plug two packs with unlike BMS types into one BMS port, say one JK pack and one Pylontech or Sunsynk pack. One port takes one CAN link, not both. Sunsynk sells a small box for this job, called Klik, model SSKLIKACC01. It joins two BMS links into one CAN link for the inverter. Port 1 goes to the inverter, Port 2 to pack 1, and Port 3 to pack 2. It gets power from the inverter RS232 port. Two JK packs do not need Klik. They link pack to pack with RS485-2.
The JK pin swap.
Some PB board drawings swap CAN-H and CAN-L. If the 60 ohm test, the volts, and the menu all read right, and F58 still will not clear, swap CAN-H and CAN-L at one end only and test again.
Firmware moves the codes.
Sunsynk firmware can move or rename the Lithium Mode codes. If comms dropped right after an update, check the code list again before you touch the cable.
The splitter trap.
A plain RJ45 splitter sharing the 2-in-1 BMS port between the battery on CAN pins 4 and 5 and a monitor on RS485 pins 1 to 3 will not work. Use one link per port.
Common questions
What does Sunsynk F58 mean?
F58 is the BMS comms fault. The inverter looked for BMS frames and did not get them. Check the cable, the port, Lithium Mode 00, and the JK CAN protocol, in that order.
What is Lithium Mode 00?
Mode 00 is the Pylontech CAN code on a Sunsynk. It runs at 500 kbps. Set Battery Type to Lithium first, then set Mode 00.
Why does the link drop at noon?
A comms cable run tight by DC lugs or AC wiring picks up noise when current peaks. Move it away from the power cables and shorten it.
Should I turn off BMS_Err-Stop to clear F58?
No. That hides the fault and lets the inverter run with no BMS data. Keep it ticked once the link works.
How do I rescue a flat pack that will not link?
Switch to Use Batt V, charge the pack, then switch back to Lithium Mode 00. That is the deep-discharge rescue.
Do this next
- Build the cable by hand with only pins 4 and 5 wired. Test it with a meter.
- Set the JK CAN code to Pylontech at 500 kbps and DIP 1000.
- Set the Sunsynk to Lithium and Mode 00. Tick BMS_Err-Stop.
- Power the BMS, then the inverter. Check SOC on both screens for five minutes.
- Check the Li-BMS page, not just the home screen. It should show live voltage, current, heat, and SOC.
- If F58 shows up, work the list in order, one change at a time.
- If the link will not hold, switch to Use Batt V for the night. Browse the full Brand Pairings hub.
Sources
Checked on 20 November 2026. Unconfirmed items are labelled “not confirmed” in the text.
- Sunsynk SG04LP1 manual, v.26, 23 May 2024. Function-port table, Battery Setting, Lithium Mode 00 for Pylontech CAN.
- Sunsynk lithium battery guide. Shut Down 3%, Low Batt 5% as a worked case. BMS_Err-Stop setting.
- Sunsynk SG04LP1 manual, fault list. F58 BMS_Comm_Fault, Battery_comm_Lose in older manuals. F56 DC bus bar voltage too low.
- Sunsynk Klik guide, model SSKLIKACC01. Joins two BMS links into one CAN link. Does not work with Acure single-phase C1 and C2.
- JK BMS community reports. JK PB board, PYLON CAN V1.2, 500 kbps. DIP 1000 for Deye and Sunsynk is a field report; JK manual lists address 0 as all switches OFF.
- ISO 11898-2 CAN standard. Idle 2.5 V per line. Dominant 3.5 V / 1.5 V. 120 ohm per end, about 60 ohms measured.
- Sunsynk approved battery list. Pylontech US2000B, US3000, US2000C, US3000C, UP5000, US5000, Force L1 and Force L2 on CAN with Mode 00. JK is not named on the list.
- This site: Brand Pairings hub, Deye & Sunsynk BMS port pinout, closed-loop vs open-loop, open-loop voltage settings.