What this guide works from. One rig: a Deye SUN-8K-SG01LP1-EU, four Pylontech US3000C packs, 15S, 48 V, 14.21 kWh in all, 296 Ah, pack volts 51.2 to 51.5 V, each pack showing three of six SOC LEDs, about half full. SOC is state of charge. 15S means 15 cells in a row.
The short answer. Set every DIP switch to 0, all four blocks at 0000. Pick the newest pack as the master. Chain the link ports from the master down the row. Wire CAN pins 4 and 5 from the master to the Deye. Pick Lithium in Battery Setting, then Lithium Mode 00. On our rig the fault was the DIP switches: each pack had a different DIP pattern, so each pack thought it was its own group. The Deye saw one pack only, showed 74 Ah, and raised F58. We set all four DIP blocks to 0000, chained the link ports, and within two minutes the Deye showed all four packs, 296 Ah, SOC 52%, and a 148 A charge limit.
The rig that would not link
Four new US3000C packs stood in a rack. Each one holds 3,552 Wh and 74 Ah. Four of them hold 14,208 Wh and 296 Ah in all, with 13,498 Wh usable. The Deye SUN-8K-SG01LP1-EU sat on the wall next to the rack. It is an 8 kW hybrid inverter: it can charge from solar, feed the house, and send spare power to the grid.
The packs looked ready. Each pack showed three of six green SOC LEDs, about half full. A meter read 51.4 V on pack A, 51.3 V on pack B, 51.5 V on pack C, and 51.2 V on pack D, near 3.43 V per cell. LiFePO4 is lithium iron phosphate.
Then the inverter was switched on. The screen showed F58, the Deye code for a BMS communication fault. BMS is the battery management system, the board that guards the pack. The screen showed no SOC, a capacity of 74 Ah instead of 296 Ah, and a charge limit of 0 A. The volts read 51.4 V, so the power cables were fine, yet the inverter heard from one pack only.
The cause was on the front of each pack. Each DIP block had a different pattern: pack A 1-0-0-0, pack B 0-1-0-0, pack C 0-0-1-0, pack D 0-0-0-1. The installer had set them like house numbers, one address per pack. That is how the older US3000 worked. It is not how the US3000C works: the slave packs get their addresses by themselves, so the four packs never formed one group. The full pinout for these packs is in the Pylontech US2000C, US3000C and US5000 pinout guide.
What the DIP switches really do
The ADD switch block on a US3000C has four small switches, DIP1 to DIP4. DIP is short for dual in-line package, a row of tiny on-off switches on the front of the pack, next to the link ports. The manual warns that the block is fitted in reverse: “Based on design of BMS, the dip switch is deployed physically reversely.” In plain words, down reads as 0 and up reads as 1. Read the position, not the printed label.
DIP1 sets the RS485 speed, a second wired data link: 0 gives 115,200 bits per second, 1 gives 9,600. Leave it at 0; our rig uses CAN, not RS485.
DIP2 sets the CAN end resistor. CAN is the data bus the Deye listens to, and it needs a 120 ohm resistor at each end. DIP2 at 0 connects the pack’s own resistor, DIP2 at 1 takes it out. In a single group, keep DIP2 at 0: the manual says “In single group mode, please keep dip2 at 0 position.” Pack B had DIP2 at 1.
DIP3 and DIP4 set the group number, one set of packs wired as one bank. Our rig is one group, so leave both at 0. They only matter with two or more groups through an LV-HUB, a Pylontech hub that joins groups. The exact multi-group patterns are not confirmed from the pages I could read, so this guide does not print them.
| DIP | What it sets | 0 means | 1 means |
|---|---|---|---|
| DIP1 | RS485 speed | 115,200 bps | 9,600 bps |
| DIP2 | CAN end resistor | 120 ohm in | Resistor out, none |
| DIP3 | Group bit | Group 0 | Group bit set |
| DIP4 | Group bit | Group 0 | Group bit set |
The master pack is not picked with a DIP switch. The manual says the pack with an empty Link Port 0 is the master. Link Port 0 and Link Port 1 are the two RJ45 sockets that join packs to each other. Chain them in one line: master Port 1 to the next pack Port 0, and so on down the row. The last pack has an empty Port 1. Only the master talks to the inverter. Use the newest pack as the master: in our rig pack A was the newest. One master can look after 15 slaves, so one group holds 16 at most.
What the pins carry
The CAN cable has one job: carry two wires from the master pack to the Deye. CAN-H is pin 4, CAN-L is pin 5, on both ends. The Deye SUN-(3-6)K manual, Appendix I, lists the BMS port pins: pin 4 CAN-H, pin 5 CAN-L, and pins 1, 2, 7, and 8 RS485. The US3000C CAN port uses the same pair, so the cable is straight through. Never swap them.
Use the short RJ45 cable that came in the Pylontech box first. If that cable is lost, build one from Cat5e or Cat6 cable, keep it under 2 metres and away from the DC power cables, and meter it first: pin 4 to pin 4, pin 5 to pin 5, no short to the next pin.
Do not plug the CAN cable into the RS485 port. The two ports share one RJ45 socket block, and RS485 uses pins 1, 2, 7, and 8. A cable in the wrong port sends data on pins the Deye never listens to, so the screen shows F58 while the volts look fine. The Deye BMS port pinout shows the full Deye pin map, and the JK BMS to Deye guide shows the same CAN pair on a JK BMS.

Which settings fit four packs
Go to System Setup, then Battery Setting. Set Batt Mode to Lithium, Batt Capacity to 296 Ah (74 Ah times four packs), Max A Charge to 148 A, Max A Discharge to 148 A, and Lithium Mode to 00. Lithium Mode is the BMS protocol code. Code 00 is the Pylontech CAN code, and Deye’s approved battery list DY-LV48-0128, issued 4 September 2026, lists the US3000C with CAN and setup code 00. The full F58 fault guide is the Deye Sunsynk F58 BMS fault pinout guide.
The 148 A number is worked, not guessed. Each pack has a recommended current of 37 A, so four packs give 148 A. The max per pack is 74 to 89 A for 60 seconds, and the Deye 8K caps its own Max A at 190 A, between the bank’s recommended 148 A and its max of 296 A.
The SOC points on the same screen are Shutdown 10%, Low Batt 20%, and Restart 40%: the SOC where the inverter stops, warns you, and brings AC output back. Leave them at 10, 20, and 40. For lithium, follow the BMS volt limits, not the lead-acid volt table. Do not copy the 57.6 V AGM volt.
| Packs | Total Ah | Total energy | Recommended A | Max A, 60 s |
|---|---|---|---|---|
| 1 | 74 | 3.55 kWh | 37 | 74 to 89 |
| 2 | 148 | 7.10 kWh | 74 | 148 to 178 |
| 3 | 222 | 10.66 kWh | 111 | 222 to 267 |
| 4 | 296 | 14.21 kWh | 148 | 296 to 356 |

Power cables need the same care. The Pylontech manual says each pair of power cables holds 100 A of steady current, and our bank runs at 148 A. One pair to the inverter is not enough: run two pairs, or run each pack to a busbar, a shared metal bar, with equal-length cables. Use 1 AWG, 50 square mm, battery cable for the 8 kW model, torqued to 24.5 Nm. Nm is newton metres.
Why the link fails when it fails
A BMS link is a short talk that repeats many times a second. The Deye sends a frame, one short packet of data, on the CAN bus. The master pack must answer with its own frames: SOC, charge limit, discharge limit, cell volts, temps, and alarms. If no answer comes back in time, the Deye raises F58 and stops trusting the pack. The volts stay live, since they come down the power cables. Volts fine plus F58 means the data link is dead.
The DIP fault breaks the talk in a quiet way. Each pack with its own group number forms its own group of one. The master answers the Deye, but it has no slaves to report, so it reports 74 Ah and its own SOC only. The other three packs sit in their own groups with no inverter to talk to. Their BMS boards and cells are fine; they just never join the bank. Only the Deye screen tells you, with F58 and 74 Ah where 296 Ah should be. A missing end resistor gives a flicker instead: the link comes up, drops, and comes up again.
The third way is the port: a CAN cable in the RS485 port sends data on pins 7 and 8, while the Deye listens on pins 4 and 5. The fix is a one-plug move. The fourth way is the profile. Lithium Mode 00 is the Pylontech CAN code. Pick 12 or leave the mode on Use Batt V, and the Deye will not try CAN at all. It will charge by volts only, with no SOC and no alarms. That is open-loop mode, a fallback, not a fix. The GoodWe ES/ET pinout guide shows the same CAN pair on a GoodWe, and the YamBMS ESP32 bridge guide shows how a bridge box speaks the same Pylontech CAN code to a Deye.
Fix it in order: ten steps, each with a check
Work the steps in order. If a check fails, stop there.
- Write down the inverter model, pack models, pack count, and date code on each label. Photograph the DIP blocks and link ports. Check: four US3000C packs, SUN-8K, photos in hand.
- Cut the power first: switch the inverter off, open the battery breaker and DC isolator, and wait five minutes. Check: screen dark, breaker open, isolator open.
- Read the volts on each pack alone. Meter each pack before you join them and write down all four readings. Check: all four within 0.1 V.
- Set every DIP block to 0000: push all four switches down on each pack, reading the position, not the label. Check: all DIPs 0 on all four packs.
- Pick the master, the newest pack, and chain the link ports. Leave its Link Port 0 empty and run a short RJ45 cable from its Port 1 to the next pack Port 0. Check: master Port 0 empty, last pack Port 1 empty.
- Wire the CAN cable from the master to the Deye: CAN port on the master only, BMS port on the Deye. Pass the cable through the magnetic ring four times. Check: pin 4 to pin 4, pin 5 to pin 5, ring fitted.
- Meter the bus with the power off, across CAN-H and CAN-L. Check: about 60 ohms.
- Set the Deye menu: Lithium, 296 Ah, Max A 148 A charge and discharge, Lithium Mode 00, Shutdown 10%, Low Batt 20%, Restart 40%. Check: every number matches.
- Power up in order and wait two minutes. Press the red SW button on the master for more than half a second, then switch the inverter on. Check: F58 gone, SOC 52%, 296 Ah, 148 A.
- Run a load test: switch on a load near 3 kW, watch the screen for ten minutes, and check each pack for heat. Check: SOC falls evenly, no pack hot.
If the reading differs, the reading is the answer
A meter can rule out a dead link in minutes. It cannot read CAN frames, but it can tell you if the bus is shorted or open. On a live bus with traffic, a plain meter shows the average: CAN-H 2.6 to 3.0 V, CAN-L 2.0 to 2.4 V. On our rig, the power-off test read 61 ohms after the fix and 118 ohms before it.
| Reading | What it means. | What to do. |
|---|---|---|
| About 60 ohms, power off. | Both end resistors are there. | Go to Step 9. |
| Near 120 ohms, power off. | One end resistor is missing. | Check DIP2 on the master. It must be 0. |
| Open circuit, power off. | No termination, a broken wire, or the plug is in a port with no CAN pair. | Check the port, then the cable. |
| Near zero ohms, power off. | A short between CAN-H and CAN-L. | Unplug each end in turn. If the short stays with the cable, swap it. |
| 2.5 V on each line, power on, idle. | Bus idle, but nobody is talking. | Check the port and the Lithium Mode. |
| 2.6 to 3.0 V on CAN-H, 2.0 to 2.4 V on CAN-L. | Traffic is flowing. The link is alive. | Go to Step 10. |
| Pack volts differ by more than 0.1 V. | Packs are at different charge levels. | Charge or discharge each pack alone until they match. |

The last row needs care. LiFePO4 volts stay flat in the middle, so two packs at 51.4 V can still sit at quite different charge levels. The volt check catches a big gap, not a small one. A guide for parallel packs puts the safe match at about 2% of SOC, so match the SOC LEDs before you join them.
What each symptom points to
Match what you see to the row below, then work the fix in that row.
| What you see. | Most likely cause. | Fix. |
|---|---|---|
| F58 on first start, no SOC, capacity 74 Ah. | DIPs set as pack addresses, packs in separate groups. | Steps 4 and 5: all DIPs to 0000, chain the link ports. |
| F58 that comes and goes, SOC flickers. | DIP2 at 1, pack-end CAN resistor out. | Step 4: DIP2 to 0 on the master. |
| F58, volts fine, capacity 0 Ah. | CAN cable in the RS485 port, or Lithium Mode not 00. | Steps 6 and 8: CAN port, then Mode 00. |
| No fault, but capacity reads 74 Ah. | Only the master reports, slaves not chained. | Step 5: check each join, Port 1 to Port 0. |
| F58 after adding a fifth pack. | New pack at a different charge level, or old pack as master. | Charge the new pack alone, make the newest the master. |
| Battery trips on a 5 kW load. | Max A set for one pack, or one cable pair for 148 A. | Step 8: Max A 148 A, two cable pairs or a busbar. |

The EG4 comms fault reads much the same. The EG4 6000XP and 18kPV BMS comm lost Error 19 fix walks through that fault on EG4 inverters.
What can still go wrong
A new pack joins an old bank at a different charge level.
The old bank sits at 40% and the new pack ships at 60%. Join them and a surge of current flows from the new pack to the old ones. The BMS may trip on over-current. Charge or discharge the new pack alone until its SOC LEDs match the bank, then join it.
The CAN bus speed is not in the manuals I could read.
The CAN bus speed for this pairing is not stated in the US3000C manual, the Deye SUN-8K manual, or the Deye SUN-(3-6)K manual, so that speed is not confirmed here. Do not change a CAN speed setting by guess.
The inverter sees the bank but the load still trips the pack.
This fault is in the power cables, not the data link. One pair of Pylontech power cables holds 100 A of steady current, and our bank runs at 148 A. If only one pair runs to the inverter, that pair heats up and the pack trips on over-current. Run two pairs, or run each pack to a busbar with equal-length cables. Fit a 100 A DC fuse on each pack feed: 74 A times 1.25 is 92.5 A.
Common questions
Do I set a different DIP address on each pack?
No. On the US3000C, the slave packs get their addresses by themselves. Set every DIP block to 0000 in a single group. The master is the pack with an empty Link Port 0.
Which pack should be the master?
The newest pack. The manual says to use the latest production unit as master for the same model. Check the date code and put that pack first in the chain, with its Link Port 0 empty.
Can I mix US3000C packs with US2000C packs?
Yes, with rules. The master must be a C model. The order is US3000C, then US2000C, then US3000, then US2000. Packs in slots 9 to 16 must be C models. The bank capacity is the sum: 74 Ah plus 50 Ah gives 124 Ah.
What Lithium Mode number do I pick for Pylontech on a Deye?
Pick 00, the Pylontech CAN code. Deye’s approved list DY-LV48-0128 shows CAN and code 00 for the Pylontech row.
How many US3000C packs can one Deye 8K take?
The manual allows 16 packs in one group, 56.8 kWh. But the Deye 8K caps its charge and discharge current at 190 A. Past four packs, more packs add run time, not more power.
What if the Deye still shows F58 after the DIP fix?
Work the chain in order: CAN cable in the CAN port; meter the cable pin to pin; Lithium Mode 00; bus near 60 ohms with the power off; master with an empty Link Port 0. If all five check out and F58 stays, swap the CAN cable for the one from the Pylontech box.
Do this next
- Read the DIP block on every pack.
- Set every DIP block to 0000 on all four packs.
- Pick the newest pack as master and chain Link Port 1 to Port 0 down the row.
- Wire CAN pins 4 and 5 from the master to the Deye BMS port.
- Set the Deye to Lithium, 296 Ah, Max A 148 A, Lithium Mode 00.
- Meter the bus with the power off: about 60 ohms.
- Power the master pack first, then the inverter, and wait two minutes.
- Run a 3 kW load for ten minutes and check no pack runs hot. Browse the full Brand Pairings hub.
Sources
Checked on 22 November 2026. Unconfirmed items are labelled “not confirmed” in the text.
- Pylontech US3000C Operation Manual, Information Version 20CQSV1103, PM0MUS3C0007. 15S, 48 V, 3,552 Wh, 74 Ah. Charge 52.5 to 53.5 V. Recommend 37 A, max 74 to 89 A at 60 seconds, peak 90 to 200 A at 15 seconds. DIP1 RS485 speed, DIP2 CAN end resistor, DIP3 and DIP4 reversed. Master is the pack with empty Link Port 0. One master with 15 slaves, 16 packs max in one group.
- Deye SUN-8K-SG01LP1-EU User Manual, SUN-(5-8)K-SG01LP1-US-EU. Battery Setting: Lithium Mode 00, Shutdown 10%, Low Batt 20%, Restart 40%. Max A 0 to 190 A for 7.6 and 8 kW models. Battery cable 1 AWG, 50 square mm, torque 24.5 Nm.
- Deye SUN-(3-6)K-SG04LP1-EU User Manual. Battery Setting: Lithium Mode 00, Shutdown 10%, Low Batt 20%, Restart 40%. Appendix I BMS port pins: pin 4 CAN-H, pin 5 CAN-L, pins 1, 2, 7, 8 RS485.
- CVC Energy, How to Read the Deye Approved Battery List. Deye Approved LV Battery List DY-LV48-0128, issued 4 September 2026. PYLON row covers US2000B, US3000, US2000C, US3000C, UP5000, US5000, Force L1, Force L2, with CAN and Lithium Mode code 00. Not Deye’s own portal.
- Eneronix, How to Wire Pylontech Batteries in Parallel. Master is the pack with empty Link Port 0. DIP1 0 is 115,200, DIP2 0 is resistor in, DIP3 and DIP4 reserved in single-group mode, all four at 0. Match packs to within about 2% SOC before joining.
- ISO 11898-2 CAN standard. Idle 2.5 V per line. Dominant 3.5 V and 1.5 V. 120 ohm per end, about 60 ohms measured.
- This site: Brand Pairings hub, Pylontech US2000C/US3000C/US5000 pinout, Deye F58 BMS fault guide, Deye Sunsynk BMS port pinout, JK BMS to Deye CAN setup, GoodWe ES/ET pinout, EG4 6000XP/18kPV BMS comm lost fix, YamBMS ESP32 bridge.