The rig that would not talk

The SH10RT sat on the garage wall. Below it, 8 m away, sat the…

02 · KEY SECTION Jump ↓

What the terminals carry

The SH-RT has no RJ45 BMS socket on the inverter. Every comms wire lands…

03 · KEY SECTION Jump ↓

Which socket is which

The bottom of an SH10RT holds more than one connector. Only one takes the…

04 · KEY SECTION Jump ↓

Why a wrong terminal or a bad shield breaks the link

Think of the link as a short call the two boxes make again and…

05 · KEY SECTION Jump ↓

Fix it in order: ten steps, each with a check

Work the steps in order. If a check fails, stop there. High-voltage DC can…

06 · KEY SECTION Jump ↓

Read the meter: what the numbers mean

A meter settles most fights about a dead link. All volts here are DC…

07 · KEY SECTION Jump ↓

What each symptom points to

Match what you see to the row below, then work the fix in that…

08 · KEY SECTION Jump ↓

What can still go wrong

Step-by-step field verification & diagnostic reference inside this section.

09 · KEY SECTION Jump ↓

Common questions

Step-by-step field verification & diagnostic reference inside this section.

10 · KEY SECTION Jump ↓

Do this next

Step-by-step field verification & diagnostic reference inside this section.

11 · KEY SECTION Jump ↓

Sources

Checked on 28 November 2026. Unconfirmed items are labelled “not confirmed” in the text.

12 · KEY SECTION Jump ↓

Operator Questions Answered (FAQ)

Multimeter CAN checks, DIP switch startup order, and 15S/16S open-loop voltage ceilings.

What this guide works from. One rig: a Sungrow SH10RT three-phase hybrid inverter, 10 kW, with one Sungrow SBR160 battery stack, five 3.2 kWh modules, 16 kWh, 320 V nominal, 50 Ah. The comms cable was 8 m long, in the same trunking as the DC power cables.

The short answer. On a Sungrow SH5.0RT or SH10RT, the battery link is not a plain RJ45 socket on the inverter. It is a screw terminal block, the COM terminal at the bottom of the inverter. CAN-H goes to the terminal marked H. The manual calls it pin 5 CANH. CAN-L goes to the terminal marked L. The manual calls it pin 7 CANL. The battery end is an RJ45 plug into the SBR COMM OUT socket. Pin 1 is CAN-H on the white-orange wire. Pin 2 is CAN-L on the orange wire. Swap H and L, or run the cable unshielded beside the power cables, and the inverter raises Alarm 714, BMS Communication Fault, and shows no SOC.

The rig that would not talk

The SH10RT sat on the garage wall. Below it, 8 m away, sat the SBR160: five grey modules stacked on a base, under one switch gear with its own DC breaker. BMS means battery management system, the board that guards the pack. Five modules times 3.2 kWh is 16 kWh. Five modules times 64 V is 320 V nominal, and the stack holds 100 cells.

At rest the stack read 318.4 V on the battery LEDs, at 62% charge. SOC means state of charge, how full the pack is. 318.4 V divided by 100 cells is 3.18 V per cell. The stack runs 250 V to 365 V, and the inverter takes 150 V to 600 V, so the volts were fine.

In the morning the link worked. The inverter showed SOC 62% and a 30 A charge limit. At noon, when the sun was strong and the PV current rose, the SOC went blank. Alarm 714, BMS Communication Fault, came up on the screen and in the iSolarCloud app. The battery LEDs still showed 62%. The pack volts still showed on the inverter. But the inverter had no SOC and no charge or discharge limit, so it stopped charging the pack.

Two faults hid in that one cable. First, CAN-H and CAN-L were swapped at the COM block: white-orange sat in L and orange sat in H. Second, the cable was flat, unshielded, four-core bell wire, run 8 m in the same trunking as the DC power cables. Either fault alone can kill the link.

After the fix, a new 3 m shielded twisted pair cable went in, CAN-H to H and CAN-L to L. The SOC showed 62% in under two minutes and the charge limit showed 30 A. A 3,000 W load ran for ten minutes and pulled 9.4 A from the pack. That is 3,000 divided by 318.4. It used 500 Wh. SOC fell from 62% to 59%. Then the sun charged the pack at 10 A for 15 minutes. That added 2.5 Ah. SOC rose from 59% to 64%.

What the terminals carry

The SH-RT has no RJ45 BMS socket on the inverter. Every comms wire lands on one screw terminal block, the COM terminal at the bottom. You unscrew the swivel nut, take out the block, push the wires in by the labels, and push the block back until it clicks. Table 6-1 in the manual, page 45, lists the labels.

Label on the blockWhat it is forWire in our rig
Meter (A2, B2)Smart energy meter.None, meter is wired here on its own cable.
RS485 (A1, B1)LG Chem battery, EV charger, or parallel inverters.None on an SBR rig.
BMS/CAN (H, L)The battery link. H is CAN-H, pin 5. L is CAN-L, pin 7.White-orange to H, orange to L.
Enable (EN_H, EN_G)LG Chem battery only, used with RS485.None on an SBR rig.
DI/DRM (D1/5, D2/6, D3/7, D4)Demand response and ripple control, by country.None.
DO (R, NO)Relay out, for a load or an alarm light.None.
Sungrow SH10RT COM terminal block diagram

Read the labels on the bottom of your own inverter, not a pin number copied from a web page. The manual says, in section 6.9.2, connect CAN High on the battery side to pin 5 CANH on the hybrid inverter and CAN Low to pin 7 CANL. Those are the H and L screw positions on the COM block. Do not wire the battery to A1 and B1: those are RS485 terminals.

The same manual says the CAN cable works with Sungrow, BYD and Pylontech batteries. The LG Chem pack is the odd one out: it talks RS485 on A1 and B1, plus the Enable wires. An SBR, a BYD or a Pylontech pack goes on H and L. An LG Chem pack goes on A1, B1 and Enable.

The battery end is different. The SBR switch gear has COMM IN and COMM OUT sockets at the bottom. COMM OUT goes to the inverter. COMM IN is for a second stack in parallel. The SBR quick guide from Sungrow Australia prints the RJ45 pin map for the battery COMM cable. It is a 568B type cable: white-orange is CAN-H, orange is CAN-L.

RJ45 pin, battery COMM OUTWire colour (T-568B)What it carries
1White-orangeCAN-H.
2OrangeCAN-L.
3White-greenNo link.
4BlueCOM.
5White-blueCAN2_H.
6GreenCAN2_L.
7White-brownRS485B.
8BrownRS485A.
Sungrow SH10RT CAN-H CAN-L and shield wiring diagram

Only pins 1 and 2 matter for an SBR on an SH-RT. The SBR manual also says to tie the power cables and the comms cable apart, never bound together.

The manual gives the cable spec in table 6-2. Use shielded twisted pair, 2 cores of 0.5 to 1.0 square mm, or CAT 5E outdoor shielded cable, 8 cores of 0.2 square mm. The run must be less than 10 m, and within 5 m is recommended. Our first cable was 8 m of flat unshielded bell wire. It met the length limit and broke every other rule. The new cable is 3 m of shielded twisted pair, 2 cores of 0.75 square mm.

The shield needs a home. The SH-RT manual names no shield drain terminal on the COM block. There is no screw marked for the shield. Standard practice on CAN and RS485 links is to tie the shield to ground at one end only, and leave it open at the other end. In our rig the drain wire is tied to the battery PE bar at the battery end and left taped back at the inverter end. That one-end rule is standard practice, not a line in the Sungrow manual, so it is labelled as such here. The manual does say, in section 6.9, that the battery should connect to the house PE bar, not straight to the inverter PE.

Which socket is which

The bottom of an SH10RT holds more than one connector. Only one takes the battery comms cable. The COM terminal is the battery comms socket. It is a round multi-pin plug at the bottom of the inverter, with the screw terminal block inside it. The battery power cables go to BAT plus and BAT minus, on SUNCLIX or Evo2 plugs, next to it. The LAN socket takes the router, and the WLAN socket takes the WiNet-S dongle. Our rig had the cable in the right socket. The fault was which screws the two wires landed on.

Why a wrong terminal or a bad shield breaks the link

Think of the link as a short call the two boxes make again and again. The inverter asks the BMS for data. The BMS answers with a frame, one short packet that holds SOC, charge and discharge limits, cell volts, and temps. If no answer comes back in time, the inverter stops trusting the pack and raises Alarm 714, BMS Communication Fault.

CAN works as a pair. At rest, both lines sit near 2.5 V. To send a bit, the sender pulls CAN-H up toward 3.5 V and CAN-L down toward 1.5 V. The receiver reads the gap between the two lines, not each line on its own. That gap is the signal. Swap the two wires and the gap flips. The receiver sees the mirror image of every frame. It reads garbage, throws the frames away, and the link stays dead.

That is why our rig showed Alarm 714 with the wires swapped. It is also why the meter fooled the owner: each line still read 2.5 V to ground, before and after the fix, because the idle volt is the same on both lines. A 2.5 V reading proves the port has power. It says nothing about whether frames get through.

Noise is the second killer. A CAN pair is a twisted pair for a reason. The twist makes noise hit both wires at the same time, so the gap between them stays clean. Flat bell wire has no twist, so noise hits one wire more than the other, and the gap wobbles. Run that flat cable beside DC power cables and the wobble grows with the PV current. That is why our rig worked in the morning and died at noon: the DC current rose with the sun, the noise rose with it, and the frames started to fail.

A shield tied at both ends adds a third fault. The inverter and the battery sit at slightly different ground volts. Tie the shield at both ends and a small current flows along the shield all day. That current is noise on the pair. Tie it at one end only and the shield still blocks noise, but no current can flow along it. That is the one-end rule. It is standard practice on CAN and RS485 links, not a line in the Sungrow manual.

The SH-RT manual says the same in section 6.1: keep comms cables apart from power cables, or comms will stop.

Sungrow SH10RT shield one-end grounding rule diagram

Fix it in order: ten steps, each with a check

Work the steps in order. If a check fails, stop there. High-voltage DC can kill. Wait ten minutes after you switch everything off before you touch a terminal.

  1. Write down what you see. Note the pack volts, the SOC on the battery LEDs, and the alarm name and number as the screen shows them. Check: volts, SOC, and Alarm 714 in hand.
  2. Check the pack volts sit inside the inverter window. The SH10RT takes 150 V to 600 V. Our stack read 318.4 V. Check: volts inside both windows.
  3. Check the alarm. Alarm 714 is BMS Communication Fault. The manual fix is to check the comms cable and the BMS terminals. Check: the alarm is 714, not a battery volt alarm.
  4. Find the COM terminal. It sits at the bottom of the inverter, next to the BAT power plugs. Check: the comms cable is in the COM terminal, not the LAN socket.
  5. Check which screws the wires land on. White-orange must sit in H, pin 5. Orange must sit in L, pin 7. Check: H and L match the labels on the bottom of the inverter.
  6. Test the cable with the power off. Meter each wire end to end: less than 1 ohm per wire, and no short between H and L. Check: each wire under 1 ohm, no short.
  7. Check the cable type and the route. It must be shielded twisted pair, 2 cores of 0.5 to 1.0 square mm, or CAT 5E outdoor shielded. It must be under 10 m, and it must run apart from the power cables. Check: shielded pair, under 10 m, away from DC cables.
  8. Build or fix the cable. White-orange to H, orange to L, at the COM block. At the battery end, the RJ45 plug goes into COMM OUT, pin 1 white-orange and pin 2 orange. Tie the shield drain to the house PE bar at the battery end only. Tape it back at the inverter end. Check: H and L at the inverter, pins 1 and 2 at the battery, shield tied once.
  9. Meter the live bus. Power on, bus idle. CAN-H to ground should sit near 2.5 V, and CAN-L to ground near 2.5 V. Check: both lines near 2.5 V.
  10. Power up in order and wait. Battery breaker on first, then PV, then AC. Wait two full minutes. On our rig the SOC showed 62% and the charge limit showed 30 A in under two minutes. Then prove it: run a 3,000 W load for ten minutes and watch SOC fall, then let the sun charge at 10 A for 15 minutes and watch SOC rise. Check: SOC 62% live, limit 30 A, SOC moves down on load and up on charge.

Read the meter: what the numbers mean

A meter settles most fights about a dead link. All volts here are DC to ground.

When you read itReading on our rigWhat it means
Stack at rest, before the fix.318.4 V, 62% SOC on the LEDs.Stack healthy, 3.18 V per cell, BMS awake.
CAN-H to ground, power on, idle, before.2.5 V.Port alive, frames fail all the same.
CAN-L to ground, power on, idle, before.2.5 V.Same trap: idle volts look fine with H and L swapped.
Cable wires, power off.Under 1 ohm each, no short H to L.Cable is sound, the fault is the wiring and the route.
Inverter SOC screen, before.Blank, Alarm 714.Link is dead, inverter has no SOC and no limits.
CAN-H to ground, power on, idle, after.2.5 V.Port alive, frames now get through.
Inverter SOC screen, after.62%, 30 A charge limit.Link is live.
Load: 3,000 W, 10 min.9.4 A, SOC 62% to 59%.Pack feeds the house.
Charge: 10 A, 15 min.2.5 Ah, SOC 59% to 64%.Pack takes charge.
Sungrow SH10RT meter readings diagram

The 2.5 V CAN reading is the one that fools people. It only proves the CAN port has power. It says nothing about frames. The proof is on the screen: SOC live, a 30 A limit, and SOC that moves down on load and up on charge. The SBR stack holds 50 Ah, so 2.5 Ah is 5% of the pack, and the SOC rose by 5%. The maths and the screen agree.

At 30 A and 318.4 V, the most the inverter can pull is 9,552 W. The SH10RT itself allows 10,600 W of charge or discharge power, so the battery is the limit, not the inverter.

What each symptom points to

Match what you see to the row below, then work the fix in that row.

What you seeMost likely causeFix
Alarm 714, no SOC, pack volts show.CAN-H and CAN-L swapped at the COM block.Step 5 and 8, move the wires to H and L.
Alarm 714, link works in the morning, dies at noon.Unshielded cable beside DC power cables.Step 7 and 8, new shielded pair, away from power cables.
Alarm 714, no SOC, cable over 10 m.Cable too long, frames lost on the run.Step 7, move the battery closer or shorten the cable.
Alarm 714, cable in the LAN socket.Wrong socket.Step 4, move it to the COM terminal.
Alarm 714, battery wired to A1 and B1.RS485 terminals used for a CAN battery.Step 5, move the wires to H and L.
Battery alarms 932 to 935, 937, 939.Battery fault, not a comms fault.Follow the SBR manual.
Battery Abnormal alarms 703, 711, 712, 715.Pack volts or temps out of range.Step 2, check the pack volts.
No fault, but screen shows volts only.Link down, inverter sees the pack but hears no BMS.Steps 4 to 8.
Link works, then drops when the load rises.Shield tied at both ends, or cable bound to power cables.Step 8, tie the shield at one end only, split the cables apart.

The first two rows are the ones most owners hit. The same-day Pylontech to Sofar guide shows a different brand where a firmware fix, not the pins, is the usual fault. See the same-day MPP Solar PIP Fault 61 guide for a 48 V pack where the pins and the protocol both matter.

What can still go wrong

Pin numbers differ across Sungrow documents, and that is a trap.

The SH-RT manual, Ver24, says CAN-H goes to pin 5 and CAN-L to pin 7. A Sungrow Australia install guide for the 3-phase hybrid says CAN-H is pin 1 and CAN-L is pin 2 on the COM plug. The older SBR quick guide for the SHRS range says pins 2 and 4 on its COM 2 green plug are for the battery CAN link. Three documents, three pin numbers, one per plug. Trust the H and L labels printed on the bottom of your own SH-RT, and the pin 5 and pin 7 numbers in the SH-RT manual.

The SBR160 operating voltage differs between the manual and the datasheet.

The SBR manual, Ver21, gives the SBR160 operating voltage as 250 V to 365 V. The Sungrow SBR datasheet, version 1 AU, gives 270 V to 365 V. The top is the same. The floor differs by 20 V. This guide uses the manual figure, 250 V to 365 V, because the manual is the newer document.

The SBR battery has no DIP switch in its manual.

Some battery brands set their address with small DIP switches. The SBR manual lists no DIP switch and no address setting. Parallel stacks link through COMM IN and COMM OUT, and up to four battery systems can run in parallel on a matching inverter.

The 120-ohm end resistor is not confirmed for this CAN link.

The CAN standard calls for 120 ohms at each end of the bus. The SH-RT manual names a 120-ohm resistor only for the smart meter RS485 run, when the run is over 10 m and up to 50 m. It names no end resistor value for the battery CAN link, and the SBR manual names none either. Do not add an end resistor on a guess.

An SBR064 does not fit an SH10RT.

The SBR064 is only for the SH3.0 to SH6.0RS single-phase range, per the SBR manual. On an SH10RT the smallest SBR is the SBR096, 9.6 kWh, 192 V nominal. The SBR only talks to Sungrow inverters.

Common questions

Which terminals carry CAN on a Sungrow SH10RT?

The H and L screws on the COM terminal block at the bottom of the inverter, pin 5 CANH and pin 7 CANL in the manual. CAN-H goes to H, CAN-L goes to L.

Is the BMS link an RJ45 plug or a terminal block?

One at each end. The inverter end is a screw terminal block inside the COM plug. The battery end is an RJ45 plug into the SBR COMM OUT socket. Pin 1 is CAN-H, white-orange. Pin 2 is CAN-L, orange.

What does Alarm 714 mean?

Alarm 714 is BMS Communication Fault. The manual fix is to check the comms cable and the BMS terminals, then reconnect the meter cable. On our rig it meant the CAN wires were swapped and the cable was unshielded beside the power cables.

Do I need a shielded cable?

Yes. The manual spec is shielded twisted pair, 2 cores of 0.5 to 1.0 square mm, or CAT 5E outdoor shielded cable. Keep the run under 10 m, within 5 m if you can, and away from power cables.

Does the SBR battery have DIP switches to set?

No DIP switch is listed in the SBR manual. Parallel stacks connect through COMM IN and COMM OUT, up to four systems.

What if CAN-H and CAN-L are reversed?

The link stays dead and Alarm 714 stays up. The meter will still read near 2.5 V on each line, so the swap hides from a volt check.

Do this next

  1. Read the COM block labels on the bottom of your inverter. H is CAN-H, L is CAN-L.
  2. Check your pack volts sit inside 150 V to 600 V on the SH10RT.
  3. Wire white-orange to H, pin 5, and orange to L, pin 7.
  4. Plug the RJ45 into the SBR COMM OUT socket, pin 1 white-orange and pin 2 orange.
  5. Use shielded twisted pair under 10 m, run apart from the power cables, shield tied at the battery end only.
  6. Power the battery breaker first, then PV, then AC, and wait two minutes for SOC to show.
  7. Check the screen shows live SOC and a 30 A charge limit, then prove it with a 3,000 W load for ten minutes.
  8. Still stuck? Call Sungrow support with your meter readings, alarm number, and pin map.

Sources

Checked on 28 November 2026. Unconfirmed items are labelled “not confirmed” in the text.

QUESTIONS ANSWERED

Operator Questions Answered (Playbook FAQ)

Switch off the battery rack breaker, DC isolator, and AC input before handling RJ45 plugs on Hybrid Inverter LiFePO4 BMS. Powered down, measure DC resistance across Pins 4 (CAN-H) and 5 (CAN-L)—a healthy terminated bus reads ~60Ω (two 120Ω resistors in parallel), while 120Ω indicates one missing end resistor.

Farhan Ahamed
WRITTEN & AUDITED BY

Farhan Ahamed

Founder & Lead Protocol Architect • BMSBridge.online

Hardware diagnostics engineer specializing in 500 kbps CAN-Bus telemetry (0x351–0x35E), RJ45 VE.Can crossovers, and cell-safe 15S/16S LiFePO4 battery interoperability.

READER DISCUSSION & QUESTIONS

Comments (0)

Leave a Comment
LEAVE A QUESTION OR COMMENT

This site uses Akismet to reduce spam. Learn how your comment data is processed.

CONTINUE READING IN CAN BUS, RS485 & RJ45 PINOUTS

Companion Field Playbooks

All CAN Bus, RS485 & RJ45 Pinouts Guides →