What this guide works from. One rig: a Sunny Island 6.0H-13, firmware 3.30.12.R, with three Pylontech US3000C packs, 74 Ah each, 222 Ah in all, 10,656 Wh. The packs rested at 52.6 V and near 60% charge. The data cable was 3 m of CAT5e. The bus limit is 30 m.
The short answer. Yes. A Pylontech US3000C talks to a Sunny Island 6.0H over SI-CAN, SMA’s own CAN protocol, on pins 4 and 5. SMA’s letter of 11 May 2023 says the US3000C and US5000 passed official tests with the Sunny Island 4.4M, 6.0H, 8.0H, and 6048US. On our rig the link was dead, and the fault was one small switch: DIP2 on the master pack sat at 1, so the pack’s CAN end cap was out. We set it to 0, and the SOC showed 58% within a minute. This guide shows the pins, the switch, and the meter readings.
The rig that would not talk
The Sunny Island 6.0H sat on the wall, and three US3000C packs sat below it in a rack. Each pack is 15 cells, 48 V nominal, 3,552 Wh. Three packs give 222 Ah and 10,656 Wh. The bank read 52.6 V at rest, 3.51 V per cell times 15 cells. The SOC LEDs on the master pack showed it just over half full. SOC is state of charge, how full the pack is. The BMS is the battery management system, the board that guards the pack.
Then the inverter was switched on. The home screen showed the pack volts, 52.6 V, but no SOC and no charge or discharge limits. The pack was fine. The BMS was awake. The link was the fault. Then a 2,000 W heater ran for ten minutes. The pack volts fell to 52.0 V, and the inverter still showed no SOC.
The proof came from the meter. With the power off, the ohms test between CAN-H and CAN-L read 100 ohms. That meant only the SMA end of the bus had an end cap. The Pylontech end had none. The DIP switch was the cause. After DIP2 went back to 0, the same test read 54.5 ohms. That is a 100-ohm SMA plug and a 120-ohm pack end cap in parallel. The link came up at once. The SOC showed 58%, in line with the pack LEDs.
What the pins carry
The CAN link on a Sunny Island 4.4M, 6.0H, or 8.0H lives in one RJ45 socket, the same plug shape as a network cable. The socket is called ComSync. The pin table here comes from SMA Technical Information SI-LiIon-TI-en-52, version 5.2, section 4. Count pins with the clip facing away from you, pin 1 on the left.
| Wire | Sunny Island ComSync | Pylontech A/CAN port |
|---|---|---|
| CAN-H | Pin 4 | Pin 4 |
| CAN-L | Pin 5 | Pin 5 |
| Ground | Pin 2 | Pin 6 |
| Cluster sync, high | Pin 3, SYNC_H. Do not wire. | Pin 3, NULL. Do not wire. |
| Cluster sync, low | Pin 6, SYNC_L. Do not wire. | No matching pin. |
| Reserved | Pins 1, 7, 8. Do not wire. | Pins 1 and 2, NULL. Pins 7 and 8 are RS485. |

Read that table twice. CAN-H and CAN-L match, pin 4 to pin 4 and pin 5 to pin 5. But the ground wire does not. It runs from pin 2 on the Sunny Island to pin 6 on the pack. Pin 6 means two different things on the two ends: SYNC_L on the Sunny Island, CAN ground on the pack. A straight network cable carries CAN-H and CAN-L right, but it leaves the ground off and ties the sync line to the pack ground. So build a 3-wire cable instead: pin 4 to pin 4, pin 5 to pin 5, and Sunny Island pin 2 to pack pin 6.
CAN-H and CAN-L must sit on one twisted pair: blue and white/blue, pins 4 and 5 in T-568B. The twist cancels noise from near wires. SMA says the bus must not run past 30 m, and the cable must be CAT5e with RJ45 plugs. Our cable was 3 m.
The Sunny Island has three sockets that look alike. Only one takes the battery cable. ComSyncIn is the battery socket. ComSyncOut is the far end of the same bus, and in a single-inverter system it holds the factory end-cap plug. ComETH is the Speedwire network socket, SMA’s Ethernet link for monitoring. Do not plug the battery CAN cable into ComETH. Our rig had the cable in the right socket, but check yours first.
The same three pins show up on the Sunny Island X, but that is a different box: a high-voltage inverter, 200 V to 980 V DC, with a socket called BAT CAN. A classic Sunny Island runs a 48 V pack, 41 V to 63 V. The full pin story is in the Sunny Island CAN pinout and termination guide, more pairings are in the Brand Pairings hub, and a SolaX hybrid is in the same-day SolaX X1 and X3 BMS port pinout guide.
The DIP switch that kills the link
Pylontech packs have a 4-switch ADD block on the front. Dip1 sets the RS485 speed: 0 is 115,200 bps, 1 is 9,600 bps. For a CAN link, leave Dip1 at 0. Dip2 sets the CAN end cap: 0 means the cap is in, 1 means NONE. In a single group, keep Dip2 at 0. Dip3 and Dip4 are reserved. Leave them at 0.
Here is the trap. The switch block is mounted backwards: the dip switch is deployed physically reversely. Physically UP is 1, physically DOWN is 0. An installer who reads the printed label the usual way sets the wrong value. On our rig, the installer set Dip2 to 1, thinking 1 meant on. It meant the cap was out. Set the switches before you turn the pack on. The same DIP2 trap broke a Growatt link in the Pylontech Growatt menu 05 and 36 guide.
A CAN bus needs an end cap at each end: a resistor across CAN-H and CAN-L that stops the signal bouncing back. SMA ships the Sunny Island with an end-cap plug in ComSyncOut, with a 100-ohm resistor between CAN-H and CAN-L and a second one between SYNC-H and SYNC-L. SMA’s own document says a 120-ohm plug can be used for both buses too. What matters is the pass band: near 50 to 60 ohms.
| Ends of the bus | Maths | Meter reading, power off |
|---|---|---|
| SMA 100-ohm plug plus pack 120-ohm cap | 100 x 120 / (100 + 120) | 54.5 ohms. Our rig after the fix. |
| Two 120-ohm ends | 120 / 2 | 60 ohms. The textbook value. |
| Two 100-ohm ends | 100 / 2 | 50 ohms. Fine here. |
| SMA plug only | 100 alone | 100 ohms. Our rig before the fix. |
| Pack cap only | 120 alone | 120 ohms. One cap is missing. |
| No cap at all | Open circuit | No reading. Bus open or wire cut. |
| CAN-H shorted to CAN-L | 0 ohms | Near 0 ohms. Unplug each end in turn. |

Our rig read 100 ohms before the fix. Only the SMA end was capped. After DIP2 went back to 0, it read 54.5 ohms. Do not chase 60 ohms. Sixty ohms means two 120-ohm ends, 50 ohms means two 100-ohm ends. Both are good.
One more fact matters for a three-pack bank. The master pack is the one whose Link Port 0 is left empty. Link the packs in a chain, Port 1 to Port 0, and plug the inverter cable into the master A/CAN port only.
Why the handshake fails
Think of the handshake as a short call the two boxes make again and again. The BMS sends a frame every 250 ms. The SMA SI-CAN protocol runs at 500 kbit/s with 11-bit IDs. The REC manual, which documents the same SMA SI CAN protocol, lists the frame set: 0x351 carries charge volts and limits, 0x355 carries SOC and health, 0x356 carries volts, current and temperature, and 0x35A carries alarms, plus 0x35E and 0x35F. The exact frame IDs the Pylontech BMS sends are not printed in the US3000C manual, so that part is not confirmed for Pylontech. What is confirmed is that the pack speaks the SMA profile: SMA’s letter says the US3000C passed official tests.
If the inverter gets no frame, it has no SOC and no limits. Field reports say that when the frames stop, the Sunny Island registers an external BMS fault and shuts off.
A missing end cap breaks this call in a sneaky way. At idle the bus looks fine. Both lines sit near 2.5 V. Then a load starts, and the frames start to fail. Each signal edge hits the open end of the bus and bounces back. The bounce lands on top of the next bit. The frame fails its check and is thrown away. Enough failed frames and the inverter gives up.
A reversed pair breaks the call too. The receiver reads the gap between CAN-H and CAN-L. CAN-H rises toward 3.5 V while CAN-L falls toward 1.5 V. Swap the two wires and the gap flips sign. The meter still shows about 2.5 V on each line at idle. No frame gets through. A missing ground breaks it a third way. Pin 2 on the Sunny Island and pin 6 on the pack tie the two boxes to the same zero level. Without it they drift apart.
Other brands show the same fault with a code of their own. On an Axpert, a blocked charge or discharge shows Error 69 or Error 70. See the same-day Axpert Error 69 and Error 70 guide.
Fix it in order: ten steps, each with a check
Work the steps in order. If a check fails, stop there. Switch everything off before you touch a terminal. Only trained techs may install the battery. If you are not trained, stop at step 1 and call your installer.
- Write down what you see. Note the pack volts and whether the inverter shows any SOC at all. Check: volts and SOC in hand.
- Check the pack is awake and in range. The pack must sit inside 44.5 V to 53.5 V. The Sunny Island takes 41 V to 63 V. Our bank read 52.6 V. Check: meter at the pack posts reads 44.5 V to 53.5 V.
- Count the packs. SMA’s letter sets the minimum at 3 US3000C packs for a 6.0H. Check: at least 3 packs on a 6.0H, at least 4 on an 8.0H.
- Check the sockets. Battery cable in ComSyncIn, end-cap plug in ComSyncOut. ComETH is the network socket. Check: cable in ComSyncIn, plug in ComSyncOut.
- Test the bus with the power off. Meter ohms between CAN-H and CAN-L. Our rig read 100 ohms before the fix. Check: near 50 to 60 ohms. If it reads 100 ohms, go to step 6.
- Check DIP2 on the master pack. DIP2 must be 0, which means the cap is in. Ours was 1. Set it to 0 and restart the pack. Check: ohms test now reads near 50 to 60 ohms. Ours read 54.5 ohms.
- Build or check the cable. Pin 4 to pin 4, pin 5 to pin 5, Sunny Island pin 2 to pack pin 6. Test each core end to end, and test CAN-H to CAN-L for a short. Check: each wire runs end to end, CAN-H to CAN-L shows open.
- Meter the live bus. Power on, bus idle. Each CAN line should sit near 2.5 V to ground. With traffic, CAN-H reads near 2.7 V, CAN-L near 2.3 V. Check: near 2.5 V each at idle.
- Run the Installation Assistant. Pick the lithium-ion battery with an external BMS. Set the nominal capacity to 222 Ah. The battery type is parameter 221.01, BatTyp, set to LiIon. Check: battery type shows lithium-ion with an external BMS, capacity shows 222 Ah.
- Power up in order and prove it. Battery first, then the inverter. Wait two full minutes. On our rig the SOC showed 58% after about 40 seconds. Then run a 2,000 W heater for ten minutes. It pulled 38.0 A and used 333 Wh, 3.1% of 10,656 Wh. SOC fell from 58% to 55%. Then charge at 40 A for 30 minutes. That added 20 Ah, 9.0% of 222 Ah. SOC rose from 55% to 64%. Check: SOC matches the pack, limits show, and SOC moves down on load and up on charge.
Three packs allow 111 A of charge, but the Sunny Island caps charge at 110 A, rated 90 A. On discharge, three packs allow 222 A, but the inverter is rated at 103 A. So the inverter is the limit both ways.
Read the meter: what the numbers mean
A meter settles most fights about a dead link. The meter at the pack posts is the truth. All volt numbers are DC to ground. On a live bus, a plain meter shows the average. The pack charge window is 52.5 V to 53.5 V. The wider question of 53.6 V vs 54.0 V float is in the same-day float voltage guide.
| When you read it | Reading on our rig | What it means |
|---|---|---|
| Bank at rest, before fix | 52.6 V, near 60%. | Bank healthy, 3.51 V per cell. |
| Ohms, power off, before | 100 ohms. | Only the SMA end capped. DIP2 was 1. |
| Ohms, power off, after | 54.5 ohms. | Both ends capped. |
| CAN lines, idle, before | 2.5 V each. | Bus idle, nobody talking. |
| CAN lines, with traffic, after | CAN-H 2.7 V, CAN-L 2.3 V. | Frames flowing, link alive. |
| Inverter SOC, before | Blank. | Link down, volts lie. |
| Inverter SOC, after | 58%, limits live. | Link live, SOC matches. |
| 2,000 W load, 10 min | SOC 58% to 55%. | 333 Wh used. |
| Charge at 40 A, 30 min | SOC 55% to 64%. | 20 Ah added. |

If the ohms test reads near 100 ohms, the pack end cap is out. Check DIP2 first. If it reads near 120 ohms, the SMA plug is missing from ComSyncOut. If it reads open, the cable is cut or both end caps are missing. If it reads near zero, CAN-H and CAN-L are shorted. Unplug each end in turn to find it. Trust the meter over the screen. A bank that reads 52.6 V but shows no SOC is a signal fault, not a volt fault. The same 0 A charge limit on a Victron has a different cause. See the Pylontech Victron charge limit 0A guide.
What each symptom points to
Match what you see to a row, then work the fix.
| What you see | Most likely cause | Fix |
|---|---|---|
| No SOC, no limits, volts show. | DIP2 at 1, pack cap out. | Steps 5 and 6. |
| SOC shows, then drops out under load. | One end cap missing. | Steps 4, 5 and 6. |
| No SOC, 2.5 V on each line. | CAN-H and CAN-L swapped. | Step 7. |
| No SOC, ohms read open. | Cable cut, or both caps missing. | Steps 5 and 7. |
| No SOC, ohms near 0. | CAN-H shorted to CAN-L. | Step 7. |
| SOC shows, charge limit 0 A. | BMS fault, or a cell out of range. | Read the pack alarms. |
| Cable in ComETH, no SOC. | Battery cable in the network socket. | Move it to ComSyncIn. |
| Link works, then dies at noon. | Cable tight against power cables. | Move the cable away. |

The first row is the one most owners hit. A new build, a good bank, and no SOC in the first hour. It is almost always the DIP switch or the socket. Pylontech on a Fox ESS H1 uses the same DIP2 trap. See the Pylontech Fox ESS H1 and KH setup guide.
What can still go wrong
The DIP block is mounted backwards, so 1 means what you think 0 means.
The manual says the dip switch is deployed physically reversely. Physically UP is 1, physically DOWN is 0. The printed label reads the other way round. An installer who sets DIP2 by the label sets it to 1 and takes the cap out. Read the switch position, not the label.
The 100-ohm plug looks wrong, so someone throws it away.
The factory plug reads 100 ohms, but the CAN spec says 120 ohms. An installer who knows the spec can think the SMA plug is wrong and bin it. It is not wrong. SMA ships it on purpose. Keep the factory plug in ComSyncOut.
Pin 7 is ground on some online diagrams, but not on a Sunny Island.
A few social media diagrams show pin 7 as ground for a CAN cable. On a Sunny Island, pin 7 is Sync7, reserved. Pin 2 is ground. Pin 6 is another trap: SYNC_L on the Sunny Island, CAN ground on the pack. Wire the ground from Sunny Island pin 2 to pack pin 6.
Two packs on a 6.0H is below SMA’s minimum of three.
SMA’s letter sets the minimum at 3 US3000C packs for a 6.0H, 4 for an 8.0H. With fewer packs, the bank cannot feed the inverter’s peak draw, and a pack can trip on over-current. The three-phase minimums are 9 packs for a 6.0H and 11 for an 8.0H.
The US2000C is on Pylontech’s list but not named in SMA’s letter.
SMA’s letter of 11 May 2023 names only the US3000C and US5000. Pylontech’s own list names the wider US range, US2000C included, against the same Sunny Island models. The two lists disagree. A US2000C on a Sunny Island is not confirmed by SMA directly. Ask your dealer to confirm it in writing before you buy.
SOC reads wrong in the first two hours after commissioning.
SMA’s own manual warns about this. The SOC and state of health recorded by battery management will deviate strongly from the real values for a newly connected battery. In the first two operating hours these gaps can cause load shedding and messages.
The exact event number for a lost BMS link is not confirmed.
Field reports say that when the frames stop, the Sunny Island registers an external BMS fault and shuts off. The SMA manual pages I read do not give one event number for a lost CAN link, so I do not print one here.
Common questions
Can a Pylontech US3000C work on a Sunny Island 6.0H?
Yes. SMA’s letter of 11 May 2023 says the US3000C and US5000 passed official tests with the Sunny Island 4.4M, 6.0H, 8.0H, and 6048US. You need at least 3 US3000C packs for a 6.0H, DIP2 at 0 on the master pack.
Which pins carry CAN on a Sunny Island?
Pin 4 is CAN-H, pin 5 is CAN-L, and pin 2 is ground, for the classic Sunny Island 3.0M, 4.4M, 6.0H, and 8.0H, in the ComSync sockets. On the Pylontech end, pin 6 is CAN ground. Wire the ground from Sunny Island pin 2 to pack pin 6.
What should the ohms test read?
Near 50 to 60 ohms with the power off, between CAN-H and CAN-L. Two 120-ohm ends read 60 ohms, two 100-ohm ends read 50 ohms. Our rig read 54.5 ohms. If it reads 100 ohms, check DIP2.
Do I need the SMA plug if the Pylontech already has a cap inside?
Yes. A CAN bus needs a cap at each end. The Pylontech cap covers the pack end, the SMA plug covers the inverter end. With only one end capped, frames fail under load.
Can I use a US2000C on a Sunny Island?
Not confirmed by SMA. SMA’s letter names only the US3000C and US5000. Pylontech’s own list names the wider US range against the same models. Until SMA names the US2000C, treat it as not confirmed.
Why does the inverter show volts but no SOC?
Because volts come down the thick DC cables, and SOC comes over CAN. A dead CAN link leaves the volts in place and takes the SOC away. Check the DIP switch, the socket, and the cable before you blame the bank.
Do this next
- Meter your bank at its posts. Expect 44.5 V to 53.5 V.
- Count your packs. A 6.0H needs at least 3 US3000C packs, an 8.0H needs at least 4.
- Check the DIP switches on the master pack. DIP2 must be 0, physically DOWN.
- Check the sockets. Battery cable in ComSyncIn, end-cap plug in ComSyncOut.
- Meter ohms with the power off. Expect near 50 to 60 ohms.
- Run the Installation Assistant. Pick lithium-ion with an external BMS and set your bank size.
- Power the pack first, then the inverter, and check the SOC matches the pack.
- Prove it with a load and a charge, and write the readings down.
- Still stuck? Call SMA support with the ohms reading and the DIP settings.
Sources
Checked on 27 November 2026. Unconfirmed items are labelled “not confirmed” in the text.
- SMA Approved Batteries and Information on Batteries in Sunny Island Systems, SI-LiIon-TI-en-52, version 5.2. Section 4, page 34: full CAN bus assignment, pin 2 ground, pin 4 CAN_H, pin 5 CAN_L, pins 3 and 6 SYNC, pins 1, 7, 8 reserved. Factory plug in ComSyncOut with integrated 100-ohm terminator, 120-ohm plugs allowed. Approved list includes Pylontech.
- SMA Successful compatibility tests between the Sunny Island inverters and Pylontech US3000C and US5000 batteries, letter dated 11 May 2023. US3000C and US5000 passed official integration tests with Sunny Island 4.4M, 6.0H, 8.0H, and SI 6048US. Minimum modules: SI 6.0H single-phase backup and off-grid needs at least 3 US3000C or 2 US5000; SI 8.0H needs at least 4 US3000C or 3 US5000.
- SMA Sunny Island 4.4M / 6.0H / 8.0H Operating Manual, SI-13, firmware 3.30.12.R. Commissioning, Installation Assistant, battery type LiIon with external BMS, data cable rules: bus length max 30 m, CAT5e cable, RJ45 plugs, close the bus at each end.
- SMA Complete Commissioning, SI-13 manual. SOC and SOH recorded by battery management deviate strongly from real values for a newly connected battery; load shedding and messages possible in the first two operating hours.
- Pylontech US3000C Operation Manual, Information Version 20CQSV1103. 48 V nominal, 3,552 Wh, 74 Ah, 15 cells, 44.5 to 53.5 V discharge, 52.5 to 53.5 V charge, recommend 37 A, max 74 A, peak 90 A, 95% depth of discharge, max 16 packs per group. Dip1 RS485 baud, Dip2 CAN terminal resistance 0 connected and 1 NONE, single group keep Dip2 at 0, switch block deployed physically reversely. Over-discharge protection at 44.5 V, over-charge above 54 V, over-current above 90 A.
- Pylontech Compatibility List of ESS and Inverters, Ver. 2.29, 2 May 2023. 48 V section lists US2000, US2000C, US3000, US3000C, US5000 and more against SMA SI 4.4M, SI 6.0H, SI 8.0H, and SI 6048US over CAN.
- REC Q BMS Manual, SMA Sunny Island compatible. SMA SI BMS CAN protocol, 500 kbit/s, 11-bit IDs 0x351, 0x355, 0x356, 0x35A, 0x35E, 0x35F, frames every 250 ms. DB9 CAN pins: pin 2 CAN-L, pin 3 ground, pin 7 CAN-H, 120-ohm termination inside the BMS.
- SMA Sunny Island 6.0H / 8.0H Technical Data, Solamart spec sheet. DC input 48 V, range 41 V to 63 V. SI 6.0H max battery charging current 110 A, rated DC charging current 90 A, DC discharging current 103 A. Rated AC power 4,600 W, 6,000 W for 30 min, 11,000 W for 3 s.
- RE-wrenches mailing list, Sunny Island and Sunny Boy AC couple thread. When BMS communication stops, the Sunny Island registers an external BMS fault and shuts off; SOC from the inverter and SOC from the battery can disagree by a wide margin in voltage mode.
- Eneronix, How to Wire Pylontech Batteries in Parallel. Master battery is the module whose Link Port 0 is left empty; use the newest pack as master; Dip1 RS485 baud, Dip2 CAN terminal resistance, switch block mounted in reverse.
- This site: Brand Pairings hub, Sunny Island CAN pinout and termination guide, Pylontech Victron charge limit 0A guide, Pylontech Growatt menu 05 and 36 guide, Pylontech Fox ESS H1 and KH setup guide, SolaX X1 and X3 BMS port pinout guide, Axpert Error 69 and Error 70 guide, Float voltage 53.6V or 54.0V guide.